Mercury 75 Operation Maintenance Warranty Installation Manual page 144

Hide thumbs Also See for 75:
Table of Contents

Advertisement

2. Insert the lower alignment pin on the grommet into the hole in the lower
cover. Ensure the lettered side of the grommet is facing out.
3. Route the hoses, wiring, and cables through the correct opening in the
grommet, as shown.
4. Install the flush hose after removing the knockouts. Refer to Flush Hose
Routing.
a
f
e
TH
SH
d
c
a -
Flush hose
b -
Grommet
c -
Remote boat harness
d -
Not used
e -
Throttle cable
f -
Fuel hose
g -
Upper alignment pin
h -
SmartCraft harness or additional harness opening
i -
Water pressure tube
j -
Battery cables
k -
Lower alignment pin
5. Install the access cover with two screws. Tighten the screws to the
specified torque.
Description
Access cover screws
OUTBOARD INSTALLATION
g
F
B
W
k
b
h
i
j
23638
Nm
7.3
134
lb‑in.
lb‑ft
65
eng

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9080 jet115115 pro xs125 optimax

Table of Contents