CleaverBrooks CEJS Installation, Operation And Maintanance page 43

Electrode boiler
Table of Contents

Advertisement

Electrode positioning (continued)
• Measure and adjust distance between bottom of electrode
boxes and counter electrodes.
• Measure and adjust the distance from each
electrode box to the center water column nozzle
plates. Each electrode box should be aligned
perfectly parallel to the center column to
ensure to the nozzle openings align precisely
with the target plates.
• After positioning electrodes, attach the drip shield to electrode
bushing.
750-272
Electrode Boiler
39

Advertisement

Table of Contents
loading

Table of Contents