CleaverBrooks CEJS Installation, Operation And Maintanance page 39

Electrode boiler
Table of Contents

Advertisement

Electrode Boiler
Lower Electrode Assembly
1. Electrode Housing
2. Copper Gasket (Triangular)
3. Electrode Bracket
4. Copper Gasket (Round)
5. Bracket Adapter*
6. Electrode Rod*
7. Graphite Gasket
8. Sponge Gasket 2-1/2" x 1-3/4"
9. Lower Centering Ring
10. Sponge Gasket 2-1/2" x 1-3/4"
11. Sponge Gasket 2-1/2" x 1-3/4"
12. Quartz Tube
13. Sponge Gasket 2-1/2" x 1-3/4"
14. Porcelain Insulator
15. Graphite Gasket
16. Drip Shield**
*Tighten electrode rod to bracket adapter
to approx. 100 ft-lb.
D o n o t u s e a n y l u b r i c a t i o n . H i g h
temperatures will evaporate lubricants
and cause electrical shorts.
* * P l a c e d r i p s h i e l d l o o s e l y o v e r
completed electrode assembly and
proceed to electrode installation.
Figure 11 - Lower Electrode Assembly
750-272
35

Advertisement

Table of Contents
loading

Table of Contents