12
SERVICE WORK ON THE CHASSIS
12.12
Removing the lower triple clamp
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
–
Release screw
handlebar and set it aside.
Info
Protect the components against damage by covering them.
Do not bend the cables and lines.
M00096-10
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
L02471-10
(EXC‑F Factory Edition, EXC‑F Six Days)
Preparatory work
–
Remove the headlight mask with the headlight. (
–
Raise the motorcycle with the lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the front fender. (
–
Remove the handlebar cushion.
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
–
Remove screw
handlebar and set it aside.
Info
Protect the components against damage by covering them.
Do not bend the cables and lines.
B01228-10
–
Remove O-ring
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
B01229-10
and hang the voltage regulator to one side.
and remove screw
. Take off the upper triple clamp with the
. Remove protective ring
(
p. 84)
(
p. 50)
p. 60)
and hang the voltage regulator to the side.
. Remove screw
. Take off the upper triple clamp with the
. Remove protective ring
.
p. 92)
p. 48)
.
53