Pre-Operation Checks - Sea-doo Speedster 200 Operator's Manual

Table of Contents

Advertisement

PRE-OPERATION CHECKS

WARNING
The pre-operation check is very
important before operating the
boat. Always check the proper op-
eration of critical controls, safety
features and mechanical compo-
nents before starting. If not done
as specified here, severe injury or
death might occur. Bring all safety
equipment required by local laws.
SUMMARY
ITEM
Hull
Jet pump water intakes
Bilge
Battery
Main battery cut-off switch
Navigation lights
Fuel tank/engine oil (P/S)
Engine compartment
Fire extinguisher
Steering
Throttle/shifter system
ICS (Inlet Clearance System)
Bilge blower and bilge pump
Safety lanyard/DESS/engine
start/stop buttons
Mandatory safety boating
equipment
Storage compartment covers
Engine coolant (anti-freeze)
Sacrificial anodes
Some of the following items may not
have been previously covered in this
guide, however they will be described
in the MAINTENANCE or SPECIAL
PROCEDURES section. Please refer
to these portions to have more de-
tailed information.
Engines should be off and the
safety lanyard must always be re-
moved from DESS post before
verifying any of the following.
Only start boat once all items have
been checked and operate proper-
ly.
OPERATION
Inspect for damage.
Inspect/clean.
Drain. Ensure plug is secured.
Inspect tightness of cables and retaining straps
and verify charge.
Ensure it is in the ON position.
Check operation.
Refill.
Verify fuel exhaust components.
Inspect condition/mounting.
Check operation.
Check operation.
Ensure ICS is not activated or that grates are in
down position.
Check operation.
Check operation.
Check operation.
Ensure they are closed and latched.
Ensure proper level is in each engine.
Verify condition (replace when 50% corroded).
WARNING

63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents