Testing The Fastrad - Nortel FastRad Installation Manual

Nortel networks telephone installation guide
Table of Contents

Advertisement

20
Testing the
FastRAD
Rerouting a Call
to the FastRAD
FastRAD Installation Guide
After the FastRAD installation and on site programming are
completed you should test the FastRAD data transfer capabil-
ities. To test the FastRAD, make a connection between the PC
running ICSRT and the KSU at the customer site.
If the PC is not located at the customer site and the FastRAD is
not programmed with Auto-answer ON, you must phone the
ICSRT operator and instruct the operator to establish a
connection with the FastRAD. In this case, refer to
Rerouting a call to the FastRAD.
If you are using a PC at the work site, refer to ICS Remote Tools
User Guide for instructions about connecting to the RAD.
The test is passed when the remote or local PC establishes a
connection with the KSU.
If the FastRAD is programmed to report alarms, you can test
alarm calls by disconnecting the FastRAD power supply. After
a few seconds, reconnect the power supply. The FastRAD
reports an alarm to the specified alarm connection centers.
If the FastRAD is not set up to Auto-answer a Central Office
(CO) line, ask the ICSRT user to set up an operator assisted-call
to your site. If the operator-assisted call is not accepted by the
FastRAD, ensure the FastRAD is not involved in a programming
session. Then ask the ICSRT user to attempt another operator-
assisted call.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Norstar fastrad

Table of Contents