Before You Start - Nortel FastRad Installation Manual

Nortel networks telephone installation guide
Table of Contents

Advertisement

Before you
start
Environment
check list
Package check
list
Make sure you read and follow the instructions in this
guide.
Make sure you have the necessary tools to complete the
installation. A Special parts check list is provided in this
guide.
Make sure all equipment in the FastRAD package is
accounted for. A Package check list is provided in this
guide.
Make sure the necessary environment and electrical con-
ditions are met. An Environment check list and list of
Electrical requirements are provided in this guide.
Important: Only one FastRAD can be connected to a KSU.
The FastRAD installation area should be:
clean, free of dust, dry and well ventilated
between 0 and 50 Celsius (32 to 122 Fahrenheit)
non-condensing relative humidity between 5% and 95%
within 800 m (2600 feet) of the Norstar KSU
Note: When using a Norstar 3X8 KSU the FastRAD must be
installed within 305 m (1000 feet).
free of Bridge taps on the FastRAD KSU TCM loop
free of Loading coils on the FastRAD KSU TCM loop
Make sure the package contains:
the Norstar FastRAD
an RJ-11 teladapt cord
a power supply with a barrel connector
a paper template (for mounting)
FastRAD Installation Guide
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Norstar fastrad

Table of Contents