Four-bay LFF hot-plug drive configuration
o
Eight-bay SFF hot-plug drive configuration
o
Install the air baffle (on page 19).
11.
Install the access panel (on page 17).
12.
Install the bezel (on page 16).
13.
Return the server to an upright position.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (on page 16).
17.
Redundant power supply enablement option
For more information about product features, specifications, options, configurations, and compatibility,
see the product QuickSpecs on the Hewlett Packard Enterprise website (http://www.hpe.com/info/qs).
Hardware options installation 32