Four-Bay Lff Hot-Plug Drive Cage Option - HP HPE ProLiant ML30 Gen9 User Manual

Hide thumbs Also See for HPE ProLiant ML30 Gen9:
Table of Contents

Advertisement

Connect the power cable.
b.
Install the air baffle (on page 19).
13.
Install the access panel (on page 17).
14.
Install the bezel (on page 16).
15.
Return the server to an upright position.
16.
Connect each power cord to the server.
17.
Connect each power cord to the power source.
18.
Power up the server (on page 16).
19.

Four-bay LFF hot-plug drive cage option

For more information about product features, specifications, options, configurations, and compatibility,
see the product QuickSpecs on the Hewlett Packard Enterprise website (http://www.hpe.com/info/qs).
To install the component:
Power down the server (on page 16).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Remove the bezel (on page 17).
3.
Place the server on its side with the access panel facing up.
4.
Remove the access panel (on page 18).
5.
Remove the air baffle (on page 20).
6.
Disconnect and remove the drive cage cable assembly.
7.
Disconnect the Mini-SAS cable from the system board.
a.
Disconnect the power cable from the power supply.
b.
Disconnect the drive cables from the rear of the drives.
c.
Hardware options installation 53

Advertisement

Table of Contents
loading

Table of Contents