IDEAL Harrier GTS 5 Installation And Servicing page 25

Gas and fuel oil
Table of Contents

Advertisement

34 ASSEMBLING THE REAR PANEL
1. Place the panel in position
2. Engage the plastic push clips.
3. Secure the panel at each corner with two
self tapping screws and shakeproof
washers.
Note.
If a pressure relief valve has already been
fitted in the flow connector or if the panel is
being replaced on a completed installation,
the top centre piece of the panel may be
removed.
35 ASSEMBLING THE FRONT TOP PANEL
1. Engage the notches in the top panel onto
the location buttons and slide forwards.
Harrier GTS -
Installation & Servicing
INSTALLATION
2
3
1
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Harrier gts 7Harrier gts 6Harrier gts 8Harrier gts 9

Table of Contents