INSTALLATION
14 PREPARING THE BASE FRAME
1. Insert the inner cross members into the slots in the side
2. Assemble the front and rear components into the ends of the
components.
side components and secure with the 4 bolts.
2
2
1
1
2
2
15 FITTING THE BASE FRAME INSULATION
1. Locate the insulation between the sides and end with the
black fabric on the underside.
Harrier GTS -
12
Installation & Servicing