IDEAL Harrier GTS 5 Installation And Servicing page 21

Gas and fuel oil
Table of Contents

Advertisement

29 HYDRAULIC TEST
After assembling the boiler body, the installer must carry out a water tightness
test at a hydraulic pressure of 1.5 times the design pressure for a period of
30 minutes. The test must be done at room temperature.
1
2
4. Fill the boiler then shut off the
supply water.
5. Shut off the inlet valve.
6. Close the vent valve.
7. Disconnect the supply water.
8. Connect the pressure system
water.
9. Open the fill valve.
10. Pressurise the boiler. Maintain
pressure for at least 30 minutes.
Any drop in pressure indicates a
leakage in the boiler body.
11. After successfully conducting the
test, release the pressure and
drain.
Harrier GTS -
Installation & Servicing
INSTALLATION
3
1
4
1. Seal off the flow and return connections.
2. Fit a suitable supply line with valves and
3. Fit a suitable valve to vent the boiler.
7
10
7,8
bar
0
union connection.
(Temporary only.)
6
5
8
9
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Harrier gts 7Harrier gts 6Harrier gts 8Harrier gts 9

Table of Contents