GAUI X3 Instruction Manual page 14

Hide thumbs Also See for X3:
Table of Contents

Advertisement

2
W6.2x7.6x0.5
W6.2x7.6x0.1
See P.22 installation of tail boom, adjust
with washer(s), lift up the main gear/shaft
/rotor head assembly to adjust , confirm
proper mesh between crown gear and tail
transmission gear.
配合P.22置入傳動尾管後,適當調整華司厚度
並上提第3軸承座,確認傘齒輪咬合順暢。
M2.6x12
6
#842024
M2.6x12
x1 pcs
12.0
P.10
主齒盤組裝
N2.5x5
#884003
N2.5x5
x1 pcs
Main gear assembly
Top: longer distance to the notch
平面離洞口處較遠朝上
Bottom:
shorter distance
to the notch
平面離洞口處較
近朝下
1
#216201
1
2
#216338

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents