☆ The drilling of holes in the ceiling must be done by the professional personnel.
Ceiling
Notes: The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm.
E、Main body of hoisting air conditioner
[ Fix the hoisting stand firmly ]
Water lever
1、The primary step for install the indoor unit.
☆ When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper
and lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break
off.
2、Use install cardboard
Installation stands for main body of the unit
Nut (supplied at scene)
Gasket (attachment)
Hoisting stand
Tighten (double nuts)
Polyethylene pipe
Fig 1
Bolt of one of the angle of outlet pipe is fix
on the angle of the drainage slot
Center of the ceiling
opening
Bolt ( attachment )
[ Fix the install cardboard ]
Fig.2
Above 20
Insert
Gasket anchor board
(attachment)
[ Fix the gasket firmly ]
Install cardboard
Bolt ( attachment )
33