Remeha Avanta Plus
3.1.1 Checking the water pressure
The water pressure should be checked against the commis-
Min. 1 bar
sioning entry in the Boiler Log Book (min 1 bar)
• If necessary, re-fill system to design pressure and re-set red
pointer to match fill pressure 2 bar.
Check system for leaks if the system needs re-filling more
than 3 times per year.
2 bar
LT.AL.W7H.000.054
3.1.2 Checking the flue pipes and air supply pipes for
leaks
• Check that the flue and air-supply connections and
pipes are sealed and the terminal exit is clear.
LT.AL.W7H.000.055
42