Circulation Pumps - REMEHA Avanta Plus 35c Installation And Service Manual

Table of Contents

Advertisement

Residual head UPR 15-60
600
500
400
300
Pump 'low'
200
100
0
0
200
400
Residual head UPR 15-70
700
600
500
400
Pump 'low'
300
200
100
0
0
200
400
600
dT 20°C 18kW
Pump 'high'
600
800
1000
CH-flow [l/h]
LT.AL.W7H.000.013
Pump 'high'
dT 20°C 28kW
800
1000
1200
1400
CH- flow [l/h]
LT.AL.W7H.000.014

2.3.2 Circulation pumps

The Remeha Avanta Plus 24s and 28c are fitted with the
Grundfos UPR 15-60 and the Avanta Plus 35c and 39c with
the UPR 15-70, two-speed circulation pumps. The control unit
ensures that when the hot-water function is active, the pump
runs at 'high'. The factory setting of the pump for CH func-
tion is 'low.' If necessary, the service installer can adjust this
to 'high' by switching parameter 21 (from 0 to 1) see par.
2.9.8.
2.3.3 Additional guidelines for the domestic and CH water
• The system should be filled with mains cold water (for the
UK this will usually have a pH of between 7 and 8).
• Power flush the pipes and radiators thoroughly to remove
all fluxes and debris before connecting the boiler to the cen-
tral heating system in accordance with BS 7593 (1992).
• The temperature of the central heating pipes and the
radiators can rise to 95°C.
1200
• Use untreated tap water only to fill the CH system.
• The pH value of the system water must be between 6 and 9.
• In case inhibitors are being used, please follow the
instructions given in par. 2.3.4.
2.3.4 Water treatment
If used correctly water treatment can improve the boilers
efficiency and increase the anticipated life expectancy of the
boiler. For further information a special document "Quality
requirements CH water" is available from Broag.
As most systems contain a variety of metals, it is considered
good practice to provide some form of water treatment in order
to prevent or reduce the following:
• Metallic corrosion
• Formation of scale and sludge
1600
• Microbiological contamination
• Chemical changes in the untreated system water
All scale deposits however small will reduce the efficiency of
the boiler and should be prevented.
Suitable chemicals and their use should be discussed with a
specialist water treatment company prior to carrying out any
work (environmental aspects, health aspects). The specifica-
tion of the system and manufacturers recommendations must
be taken into account, along with the age and condition of
the system. New systems should be flushed thoroughly to
BS 7593(1992) to remove all traces of flux, debris, grease
and metal swarf generated during installation. Care to be
taken with old systems to ensure any black metallic iron oxide
sludge and other corrosive residues are removed, again by
power flushing, ensuring that the system is drained completely
from all low points.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avanta plus 28cAvanta plus 39cAvanta plus 24s

Table of Contents