INTRODUCTION
1
1.2 Safety during assembly and installation
1.3 Safety during installation, inspection and maintenance
2
2.1 Scope of delivery
2.2 Mounting the boiler
2.2.1
Clearance requirements
2.2.2
2.2.3
2.3 Water-side connections
2.3.1
Water fl ow
2.3.2
2.3.3 Additional guidelines for the domestic and CH water
2.3.4
Water treatment
2.3.5
2.3.6
2.3.7
Connecting DHW pipes (Combi-type only)
2.3.8
2.3.9
Connecting 'CH fl ow'
2.3.10
2.3.11
Connecting under fl oor heating
2.4 Gas-side connections
2.4.1
Additional guidelines for gas connections
2.4.2
2.5 Flue terminal and air supply connections
2.5.1
Flue terminal positions
2.5.2
Room sealed fl ue
2.5.3
Connecting the fl ue terminal and air supply
2.6.1
The control unit
2.7.1
On/off control - room temperature (volt free switching)
2.7.2
Time control using an internal or external 230 V clock
2.7.3
2.7.4
Modulating control - room or outside compensation
2.7.5
2.7.6
2.7.7
Connecting a frost protection device
2.7.8
2.7.9
Connecting remote alarm and boiler run indication
2.7.10
Connecting a PC/PDA
2.9.1
Control Panel
2.9.2
Additional guidelines for commissioning
2.9.3
Putting the boiler into operation
2.9.4
2.9.5
2.9.7
2.9.8
Changing the parameters at service level (with access code)
2.9.9
2.9.10
Remeha Avanta Plus
2
5
5
5
5
7
7
7
7
8
10
10
10
11
11
11
12
13
13
14
14
15
15
15
15
16
16
16
17
18
19
19
20
22
23
23
23
24
25
25
26
26
26
27
27
27
27
27
33
33
35
35
37
39