Inspection And Maintenance - REMEHA Avanta Plus 35c Installation And Service Manual

Table of Contents

Advertisement

3 INSPECTION AND MAINTENANCE

The Remeha Avanta Plus is practically maintenance free but
should be inspected annually.
If during the annual inspection the flue gas analysis indicates
that the values are outside the figures given in table 10,
maintenance work should be carried out as described in
par.3.2. Also carry out maintenance if the ionisation read-out
value is lower than 3 or higher than 9μA, or when the flame
core is not satisfying.
Only Remeha spare parts/materials should be used.
All service and maintenance must be carried out by a quali-
fied Engineer with the relevant training and certification (i.e.
CORGI - ACS - IEE registrations etc).
3.1 Inspection
The annual inspection of the Remeha Avanta Plus can be lim-
ited to the following checks:
- check the water pressure, see par. 3.1.1;
- check the flue pipes and air supply pipes for leaks, see par.
3.1.2.;
- check and clean (if necessary) the condensate siphon, see
par.3.1.3.;
- check the ignition electrode and ionisation, see par. 3.1.3;
- check the combustion and flame colour, see par. 3.1.5;
- fill in the Boiler Log Book.
> 1 bar
LT.AL.W7H.000.053
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avanta plus 28cAvanta plus 39cAvanta plus 24s

Table of Contents