VESPA GT 200 Workshop Manual page 109

Hide thumbs Also See for GT 200:
Table of Contents

Advertisement

Vespa GT 125-200
Engine
- Slightly preload the spring.
- Make sure that the clutch is perfectly inserted into
the adapter ring before proceeding to tighten the
clutch nut.
- Place the tool in the clamp with the control screw
on the horizontal axis.
- Fully preload the spring.
- Apply the clutch fixing nut and tighten it to the
prescribed torque using the special 46x55 wrench.
- Loosen the tool clamp and insert the belt accord-
ing to its direction of rotation.
- Lock the driven pulley again using the specific
tool.
- Preload the clutch return spring with a traction/
rotation combined action and place the belt in the
smaller diameter rolling position.
- Remove the driven pulley /belt unit from the tool.
N.B.
DURING THE SPRING PRELOADING PHASE, BE CARE-
FUL NOT TO DAMAGE THE PLASTIC SPRING STOP AND
THE BUSHING THREADING.
N.B.
FOR DESIGN REASONS, THE NUT IS SLIGHTLY ASYM-
METRIC; THE FLATTEST SURFACE SHOULD BE MOUN-
TED IN CONTACT WITH THE CLUTCH.
Specific tooling
020444Y Tool for fitting/ removing the driven
pulley clutch
020444Y011 adapter ring
020444Y009 46x55 Wrench
Locking torques (N*m)
Nut locking clutch unit on pulley
55 ÷ 60 Nm
ENG - 109
Downloaded from
www.Manualslib.com
manuals search engine

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt 125

Table of Contents