Installation Of Electric Deflector Kit 8151 - Blizzard B74C Operator And Parts Manual

Table of Contents

Advertisement

Installation of Electric Deflector Kit 8151

(Figures 19 to 21 & Electrical Diagram)
PRE-ASSEMBLY
1. Figure 19A: Install the clevis with the 1 1/32"
diam. hole (item 1) on the actuator base
(item 2), and the one with the 1 5/32" diam.
hole (item 3) on the other end and attach
using two 1/2" NC x 2 1/2" bolts and two 1/2"
NC nylon insert locknuts (items 4-5).
2. Figure 19A: Install a 3/16" x 1 3/4" spring pin
(item 6) on each 1" pin (item 7).
Figure 19A
OM 0410SB-A
ASSEMBLY
3. Figure 19 & diagram: Connect the wires to
the switch as follows:
72" black ground wire (item 1) to terminal
"C" (see diagram).
72" red fuse wire (item 3) to terminal "B
(see diagram).
360" red and black actuator wires (item 4)
to terminal "A" and "D" (see diagram).
Figure 19
23
Diagram