Main code 67
67-2
Purpose
Operation test, check
Function (Content)
Used to check the parallel I/F operation of the
printer.
(This simulation is made only in the production
site and not in the market.
It requires a special tool.)
Section
Printer
Item
Operation
Operation/Procedure The Centro port is checked.
1) Insert the adjustment jig into the Centro port
under the ready state, and press STRT.
2) The Centro port check is started.
3) If normal, OK is displayed. If abnormal,
the stage number where an error occurred
and NG are displayed.
<This simulation is used only for production, and inhibited in the market.>
SIMULATION 67-2
CENTRO PORT CHECK.
CENTRO PORT:
READY
Press [START] key
under the ready state.
SIMULATION 67-2
CENTRO PORT CHECK.
OK
(or
STAGE7 NG
CENTRO PORT:
<Display message>
WAITING
Waiting
READY
Check start OK
OK
Check complete (normal)
STAGE*NG
Check end (An error occurred in Stage *: 1-11)
67-11
Purpose
Adjustment
Function (Content)
Used to set Enable/Disable of the parallel I/F
select signal of the printer.
Section
Printer
Item
Operation
Operation/Procedure The select signal of Centro port is set.
Press START to set.
SIMULATION 67-11
CENTRO SELECT IN SIGNAL SETTING. SELECT 0-1, AND PRESS START.
0. OFF
1. ON
<Set values>
0
OFF
1
ON (Initial value)
Press [CUSTOM SETTING] key.
)
0
AR-M350 SIMULATIONS 10-73
67-16
Purpose
Operation test, check
Function (Content)
Used to check the operation of the network card.
Section
Printer
Item
Operation
Operation/Procedure The network card is checked.
SIMULATION 67-16
NETWORK INTERFACE CARD CHECK.
NIC:
CHECKING
Check complete
SIMULATION 67-16
NETWORK INTERFACE CARD CHECK.
NIC:
OK (or NG)
<Display message>
CHECKING
OK
NG
Press [CUSTOM SETTING] key.
Checking
Check complete (Normal)
Check end (Abnormal)