3. Adjustments flow chart when replacing the T100
The sequence of adjustments items when replacing the T100 main circuit board is as follows.
N ote Prod. ID FW
✁
✁
S et the initial data
SR adjustment (SR unit adjustment)
✂
K 20D_SR_Operation_Adjustment
Single-lens reflex functional section adjustment
K 20D_PDCAdj
☎
✂
SR adjustment (SR gain adjustment)
Shutter speed adjustment according to the histogram
Function test
*SR check can be skipped if SR adjustment is completed.
P roduct ID FW
✂
✄
✂
I nitial Data Set
✄
(
D ata initialization is unavailable)
✆
✝
K 20D_Uniformity_CS
✄
✂
K 20D_FI_CS
✄
✂
7 7010 SR_Gain For CS
Digital section adjustment
7 7010 M-Test CS
✂
✂
K 20D_PDCAdj
- This Document can not be used without Samsung's authorization -
✄
✄
✄
✄
WDC (Adjust the defective white pixels)
7 7010_White Pixel Adjust
✂
Initial settings
(Initialized at the factory)
✂
I nitialize Set
. ADJUSTMENT
✄
✄
77