Samsung GX-20 Service Manual page 255

Hide thumbs Also See for GX-20:
Table of Contents

Advertisement

Put the body on a stable support (table) downwards.
Check the CCD ID no. when replacing the T100 circuit board.
3. Adjustment procedure
Start the PC.
Connect the body to the PC using the USB cable and connect the AC adapter to the body. (power ON)
Check that the hot plug icon display is recognized on the PC.
Double click on the
The adjustment screen appears.
Click on the [Start] button.
K 20D SR Operation.exe
- This Document can not be used without Samsung's authorization -
file in the adjustment software folder and execute it.
. ADJUSTMENT
79

Advertisement

Table of Contents
loading

Table of Contents