HAMPTON BAY H27-NG10 Owners & Installation Manual page 20

H27 series
Table of Contents

Advertisement

installation
|
20
Vertical Venting with Two (2) 90
One 90
elbow = Two 45
o
Option V
H
A)
1' Min.
4' Max. 2' Min.
B)
2' Min.
5' Max. 3' Min.
C)
3' Min.
6' Max. 4' Min.
D)
4' Min.
7' Max. 5' Min.
E)
5' Min.
8' Max. 6' Min.
Lengths do not include elbow indicated
Vent restrictor position A (fully open), refer to the "Vent
Restrictor Position" section.
Vertical Venting with Two (2) 90
One 90
elbow = Two 45
o
Option
H + H1
V
A)
2' Max.
2' Min.
B)
3' Max.
3' Min.
C)
4' Max.
4' Min.
D)
5' Max.
5' Min.
E)
6' Max.
6' Min.
Lengths do not include elbow indicated
Vent restrictor position A (fully open), refer to the "Vent
Restrictor Position" section.
20 |
Hampton
H27-10 Direct Vent Freestanding Gas Stove
®
Elbows
o
elbows.
o
V + V1
With these options, max. total
pipe length is 30 feet with min.
of 6 feet total vertical and max.
8 feet total horizontal.
Please note min. 1 foot
between 90
elbows is re-
o
quired.
Elbows
o
elbows.
o
With these options, max. total
pipe length is 30 feet with min.
of 6 feet total vertical and max.
6 feet total horizontal.
Please note min. 1 foot
between 90
elbows is
o
required.
V1
H
V

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H27-lp10

Table of Contents