Installing The Rbc-3 Battery Cabinet - Eaton FERRUPS Installation Manual

Powerware series rack mount ups
Hide thumbs Also See for FERRUPS:
Table of Contents

Advertisement

Installing the RBC-3 Battery Cabinet

6.
At each battery cabinet, use the voltmeter to check the DC polarity
and to measure the voltage between the battery connector's
+
positive (
) and negative (
NOTE Be sure to check both connectors on the RBC-2 battery cabinets.
The measurements should be acceptable for your model's nominal
voltage:
850 VA to 1.4 kVA models: +12 Vdc (nominal). If you measure less
than 11.5V, check for wiring errors.
1.8 to 7 kVA models: +48 Vdc (nominal). If the batteries are
well-charged, the measurement may be as high as 51–53V. If you
measure less than 42V, check for wiring errors.
7.
Slide the battery tray(s) back into the rack.
8.
Fasten each battery cabinet front panel to the rack by inserting
eight bolts into the front panel slots and tighten the bolts securely.
9.
Before you can complete the DC connections, continue to "UPS
Cabinet Installation" on page 43 to mount the UPS in the rack.
RBC-3 battery cabinets are designed to fit in a standard 19I (48.3 cm)
wide rack that is built to EIA 310-C standards. Before installing the
cabinet(s), be sure you have the parts listed in Table 8 and shown in
Figure 11 for each battery cabinet.
Table 8. RBC-3 Battery Cabinet Parts
Item Number
(see Figure 11)
1
#8-32
2
1/4-20
3
1/4-20 Keps nuts
4
Slide rails
5
Long rear mounting brackets
6
Short front mounting brackets
Eaton FERRUPS Rack Mount UPS (850 VA–7 kVA) Installation Guide
BATTERY CABINET INSTALLATION
-
) terminals.
Description
3/8I Phillips pan-head screws
1 1/4I flat-head screws
www.eaton.com/powerquality
Quantity
6
8
8
2
2
2
S
164201425 Rev 1
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents