Installing Ups External Battery Cabinet And Battery Power Cabling - Eaton 9PHD User And Installation Manual

Hide thumbs Also See for 9PHD:
Table of Contents

Advertisement

Eaton 9PHD UPS 30–200 kW
Eaton battery breakers are open if the breaker itself is open. The default voltage
of the shunt trip coil is 24Vdc. For 48Vdc shunt trip, contact local Eaton Service
Engineer.
Figure 25. Battery trip wiring
A
Signal interface connections
B
Battery breaker signal connections
C
External battery breaker
1
X10:10
2
X10:9
3
X6:2
5.3
power cabling
For instructions on how to install the external battery cabinet and battery power
cabling, see the instruction manual provided with the external battery cabinet.
Earth the external battery cabinet / customer-supplied battery system to the PE
terminal shown in Figure
©
Eaton Corporation plc 2017. All rights reserved.
Installing UPS external battery cabinet and battery
20
4
X6:1
5
Aux contact return
6
Aux contact
7
Shunt trip return
8
Shunt trip
21
and Figure
.
Document ID: P-164000531
User's and installation guide
67 (127)

Advertisement

Table of Contents
loading

Table of Contents