Page 1
. e a t o n . c o m MX Frame Scalade Up To 20kVA Escalade hasta 20kVA Installation and User Manual Manual de instalción y de usuario Pulsar Series...
Contents Introduction ..........................3 IMPORTANT SAFETY INSTRUCTIONS ..................4 Symbol Usage ..........................5 1. Presentation MX 10U Frame Positions ....................7 MX 16U Frame Positions ....................8 10U Rear Panel ......................9 16U Rear Panel ......................10 Display and Control Panel ....................11 Extended Battery (EXB) ....................12 2. Installation Unpacking and Contents Check for 10U ..............13 Unpacking and Contents Check for 16U ..............14 Installation of Wheels and Leveling Feet (Shown for 16U Frame) ......15...
Page 6
Contents 5. Troubleshooting Troubleshooting LEDS (21) and (22) ................33 Troubleshooting Not Requiring EATON After-Sales Support ........33 Troubleshooting Requiring EATON After-Sales Support ..........34 6. Life Cycle Monitoring (LCM) Description .........................35 7. Maintenance Hot Swapping the Power Sub-Module ................37 Hot Swapping the Battery Sub-Module ...............37 8.
Before installing MX Frame, please read the booklet on the required safety instructions. Then follow the indica- tions in this manual. To discover the entire range of EATON products and the options available for the MX range, we invite you to visit our web site at www.eaton.com or contact your EATON representative.
UPS recycling at the end of service life: ◗ EATON undertakes to recycle, by certified companies and in compliance with all applicable regulations, all UPS products ◗ recovered at the end of their service life (contact your EATON branch office).
Symbol Usage Important instructions that must always be followed. Information, advice, help. Visual indication. Action. Audible signal. LED off. LED on. 86-87021-00 A01 - Page 5...
10U Rear Panel MX Frame (1) Manual Bypass switch (2) Slots 1 and 2 for optional communica- tion cards (3) Input switch (4) Connector for Remote Power Off control (RPO) (5) RS232 communication port (6) Connector for automatic detection of additional battery modules 1 through 2 (7) USB communication port (8) Communication port by relay...
16U Rear Panel MX Frame (1) Manual Bypass switch (2) Slots 1 and 2 for optional communication cards (3) Input switch (4) Connector for Remote Power Off control (RPO) (5) RS232 communication port (6) Connector for automatic detection of additional battery modules 1 through 4 (7) USB communication port (8) Communication port by relay (9) DC connector for additional battery...
Extended Battery (EXB) MX EXB RT (optional battery module) (11) Connectors for automatic detection of battery module(s) (12) Connectors for battery modules (to the UPS or to the other battery modules) (13) DC Battery circuit breaker MX Frame offers a standard backup time of 5 minutes at full load. To increase backup time, it is possible to connect MX EXB RT modules to the MX Frame.
Installation of Wheels and Leveling Feet (Shown for 16U Frame) The battery sub-modules and power sub-modules must not be mounted yet. Do not install the UPS or battery module in a closed environment without air circulation. Follow steps 1 thru 6 for installation of wheels. 1.
Need help?
Do you have a question about the Pulsar Series and is the answer not in the manual?
Questions and answers