21 CONTINUED...

3. INTERNAL CONNECTION TO SOIL AND VENT STACK

Termination into a down pipe can take place providing it can be
confirmed that the down pipe is part of a combined waste and rain
water system.
* Make connection to SVP using a solvent welded saddle

4. TERMINATION TO SOAK AWAY

5. TERMINATION TO DRAIN / GULLEY

22 PACKAGING REMOVAL (TANK MODULE)

1. If the tank module is still packaged, lift out the
sleeved front panel and store to one side to avoid
damage.
Note.
Leave pipe nut protector in place to aid installation
onto piping the frame.
2. Remove and save the floor cardboard template.
3. Remove the packaging sleeve, corner protectors and
front protector.
4. Remove two front screws securing tank module to the
packaging base.
5. Slide module forward to free it from rear fixings.
istor system store -
Installation and Servicing
INSTALLATION
BOILER
External
wall
BOILER
cla7774
External
wall
BOILER
cla7775
Air Break
cla9253
Termination
to Soak away
Ground Level
minimum
500mm
Open end of pipe
direct into gulley
below grating but
above water level
Ground Level
DRAIN
Sleeved front panel
23