12 BOILER PACKAGING AND REMOVAL
The boiler is supplied in two separate cartons. The tank
module carton includes the pre-piping frame, the hardware
pack, the literature pack and cardboard template.
The boiler module carton includes the controls facia panel
with integral programmer.
A telescopic flue assembly (if specified) for lengths up to
595mm, rear or side flue outlet, in Pack B.
Optional extras, If ordered, are available in separate boxes.
The tank module carton should be opened first and the
prepiping frame removed. It is unnecessary to unpack the
boiler module at this stage.
Pre-piping
Frame
Corner
Protectors
TANK MODULE
Hardware Pack Contents
A Mains connector assembly - 1 off
B Fibre sealing washer - 8 off
C Gas line sealing washer - 2 off
D 3/4" straight adaptor & nut - 1 off
E 15mm olive -1 off
F 15mm PRV nut -1 off
G M5 x 6 pp screw - 2 off
H M5 x 12 pp screw - 2 off
J
Strain relief bush - 1 off
K Turret clamp - 1 off
L M5x10 p hex screw (turret fixing) - 1 off
M Pressure reducing valve (preset to 2 bar) - 1 off
N PRV lift lever - 1 off
P Pressure Relief Pipe - 1 off
Pack B Contents
A
Telescopic flue terminal
B
Flue turret
C
Rubber Terminal Wall Seal
D
Screw
E
Sealing tape
18
INSTALLATION
1. Ensure the tank module is stood correctly as marked on
2. Remove the strapping.
3. Fold back the top flaps to gain access to the instructions,
4. Remove the instructions and read thoroughly.
5. UNSCREW THE RETAINING SCREWS AND REMOVE
Note.
The appliance packaging may be left on for protection at this
stage, while all service pipes are made to the pre-piping
frame.
Sleeved front panel
(sleeve not shown)
Wooden
Packaging
Base
B
A
H
J
G
B
the carton.
the pre-piping frame and cardboard template.
THE PRE-PIPING FRAME FROM THE CARTON.
BOILER MODULE
C
K
M
L
A
E
D
istor system store -
E
D
F
P
N
ist9004
C
isfu8751d
Installation and Servicing