Seagull Models CESSNA 152 Assembly Manual page 15

Table of Contents

Advertisement

Because of the size of the cowl, it may be nec-
essary to use a needle valve extension for the
high speed needle valve. Make this out of suf-
ficient length 1.5mm wire and install it into
the end of the needle valve. Secure the wire in
place by tightening the set screw in the side of
the needle valve.
2) While keeping the back edge of the cowl
flush with the marks, align the front of the
cowl with the crankshaft of the engine. The
front of the cowl should be positioned so the
crankshaft is in nearly the middle of the cowl
opening. Use the spinner backplate as a
guide. Hold the cowl firmly in place using
pieces of masking tape.
WWW.SEAGULLMODELS.COM
Epoxy.
Machine screw M3x10mm
3) Install the muffler and muffler extension
onto the engine and make the cutout in the
cowl for muffler clearance. Connect the fuel
and pressure lines to the carburetor, muffler
and fuel filler valve. Secure the cowl to fuse-
lage using the M3x10mm screws.
ELECTRIC POWER CONVERSION.
1) Locate the items neccessary to install
the electric power conversion included
with your model.
2) Recommendation EP parts as shown
(not included with your model).
- Model size: .60 size models
- Motor: 50mm 310 rev per volt
- Propeller: 14x10 ~ 15x10
- ESC: 60A
- Lipo Batteries: 8 cell 5200mA
3) Attach the electric motor box to the
firewall suitable with the cross lines
drawn on the electric motor box and
firewall. Using epoxy and balsa stick
to secure the motor box to the firewall.
Please see pictures below.
Needle valve
.
15

Advertisement

Table of Contents
loading

Table of Contents