Pcbs - REMEHA Quinta Pro series Installation, User And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro series:
Table of Contents

Advertisement

Fig.28
Release input
On/off
OT
BL
RL
Tout Tdhw
Fig.29
Open housing for PCBs
2
Fig.30
IF-01 PCB
1
%
2
IF-01
X1
123157 - v.06 - 24022015
The boiler has a release input. This input relates to the RL terminals of the
connector.
The parameter
The parameter
AD-0000053-01

6.6.5 PCBs

The PCBs are positioned in the PCB housing.
The following PCBs are already installed in the PCB housing:
1
x3
AD-3000341-01
The IF-01 PCB can be built into the instrument box or the housing for the
PCBs. See the instructions provided with the product.
X5
If the boiler locks out, a relay is de-energised and the alarm can be trans­
mitted via a potential-free contact (maximum 230 V, 1 A) on terminals Nc
and C of the connector.
X4
AD-0000054-01
The interface uses OpenTherm to communicate with the boiler control
unit. To make this possible, the OTm connection must be connected to the
OpenTherm input of the boiler control unit.OTm
A choice can be made with this control between control based on temper­
ature or heat output. The two controls are described briefly below.
For more information, see
Changing the parameters, page 48
Release input
Warning
Only suitable for potential-free contacts.
can be used to change the function of the input.
can be used to change the wait time of the input.
For more information, see
Changing the parameters, page 48
IF-01
SCU-S02
SCU-X01
Connection options for the 0–10 V PCB (IF-01)
Caution
Do not connect a frost thermostat or room thermostat to the boiler
if using the 0–10 V PCB.
Connecting the status relay (Nc)
Connection (OTm)
Analogue input
1. Connect the input signal to terminals 0–10 of the connector.
6 Installation
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents