Filling The Siphon; Filling The System - REMEHA Quinta Pro series Installation, User And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro series:
Table of Contents

Advertisement

Fig.35

Filling the siphon

AD-0000064-01
123157 - v.06 - 24022015
6.7.2 Filling the siphon
Danger
The siphon must always be sufficiently filled with water. This pre­
vents flue gases from entering the room.
1. Remove the siphon.
2. Fill the siphon up with water.
3. Fit the siphon.
4. Check whether the siphon is firmly fitted in the boiler.

6.7.3 Filling the system

Caution
Before filling, open the valves on every radiator in the installation.
Note
In order to be able to read off the water pressure from the boiler
display, the boiler must be switched on.
1. Fill the central heating system with clean tap water.
Note
The recommended water pressure is between 1.5 and 2 bar.
2. Check the water-side connections for tightness.
Note
After switching on the power and if there is adequate water pres­
sure, the boiler always runs through an automatic venting program
lasting approximately 3 minutes (air may escape via the automatic
air vent during filling). If the water pressure is lower than 0.8 bar,
the symbol
will appear. If the water pressure is too low, top
up the CH installation.
Caution
Carry out the filling within 30 minutes to avoid the venting pro­
gram starting up. That would indeed be undesirable if the boiler
is not filled. Switch the boiler off if the CH installation is not be­
ing topped up immediately.
When venting, prevent water from getting into the boiler casing
and electrical parts of the boiler.
6 Installation
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents