REMEHA Quinta Pro series Installation, User And Service Manual page 31

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro series:
Table of Contents

Advertisement

Fig.19
Connecting the power supply cable
1
4
X81
X81
123157 - v.06 - 24022015
Connecting the pump
The pump must be connected to the standard PCB of the PCU. Proceed
as follows:
1. Connect the cable supplied with the boiler to the pump.
2. Remove the grommet from the opening in the middle of the base of
the boiler.
3. Pass the pump cable through the base of the boiler and seal the
opening by tightening the bayonet fitting to the cable.
4. Connect the pump cable to the cable in the instrument box that is
connected with connector X8.
5. Add the pump cable to the cable bundles by opening and closing the
2
3
cable bundle bands.
X81
X8
5
AD-0000043-01
6 Installation
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents