Green Tube Connection (From Adapt-A-Valve To Pump); Green Tube Connection (From Ro System To Esov); Blue Tube Connection (From Ro System To Esov); Blue Tube Connection (Esov) - Watts ZRO-PURE Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

In the parts bag locate two 3/8" male stem adapters and insert them into the upper ports
on the ESOV as pictured in the photos below.

Green Tube Connection (From Adapt-a-Valve to Pump)

Insert the open end 1/4" green tube from the Adapt-a-Valve into
Step 14
the 1/4" open end of the booster pump quick connect union.
Make sure the tube is pushed in all the way to the tube stop.
Green Tube Connection (From RO System to ESOV -
Step 15
Insert the 1/4" green tube from the RO module into the 1/4"
open end of the ESOV assembly quick connect union. Make
sure the tube is pushed in all the way to the tube stop.
Blue Tube Connection (From RO System to ESOV -
Step 16
Insert the 1/4" blue tube from the RO System into the 1/4" open
union of the ESOV - pump side. Make sure the tube is pushed
in all the way to the tube stop.
Blue Tube Connection (ESOV -
Step 17
In the parts bag, locate the 1/4" blue tubing. Insert one end of
the 1/4" blue tube into the open 1/4" union of the ESOV.
Electronic Shut-off Valve
Page 9
ESOV
PUMP
Electronic Shut-off Valve
ESOV
PUMP
Electronic Shut-off Valve
ESOV
)
PUMP
ESOV
PUMP
)
)

Advertisement

Table of Contents
loading

Table of Contents