Coal(Kw) - Baymak Linyitomat Plus Instructions And Operating Manual

Domestic solid fuel boilers
Table of Contents

Advertisement

• Wait when woods and coal is completely turn to charcoals, spread the
charcoals in the boiler at list 5 cm from back side. Rack up the coal front
side more than back side like a ramp. (Amount of the coal is depending on
the calorific value of the coal). Water temperature decreases 15-20º C, while
this operation. When the coal begun gas free, boiler should be skewered
from lover side.
• The boiler shouldn't be loaded If the coal is not turn to completely charcoal.
Boiler back side must not be closed. Back side air flow definitely should be
made. Before leaving the boiler asleep at the nights, the charcoals should be
spread in the boiler and covered up on the charcoals completely. All the
doors should be closed.
Charcoal
• To start to burn at the mornings, the coal in the boiler should be skewered at
the lover side for reveal of the charcoals. If the charcoals are not enough,
some wood parts to be added for to being increased charcoal amount. Then
boiler to be loaded like a ramp.
• Coal loading period may not be same because of different type coals have
different calorific value
Don't use cokes.
63 9810.0293 - Rev.00 - 08/09/2008
Coal
Charcoal
Coal
Front Side
Front Side
23

Advertisement

Table of Contents
loading

Table of Contents