a)The arm is at normal position
You can discharge the ash from the boiler and load the coal into the fire
room with the ash tray which be put into bottom of the combustion chamber.
Coal
loading
• The fan assembly; you must be sure that no air leakage by fixing the
gasket between fan(you will find the fan in the combustion chamber, when
you unpacked the boiler.) and the door with screws. The electricity
connection must be comply with the electrical scheme.
63 9810.0293 - Rev.00 - 08/09/2008
b)The arm is at ahead position c) The arm is at back position
Ash
discharging