Installation - Baymak Linyitomat Plus Instructions And Operating Manual

Domestic solid fuel boilers
Table of Contents

Advertisement

Linyitomat Plus Boiler Model
Flue Gas Pipe Connection Diameter(mm)

Installation

63 9810.0293 - Rev.00 - 08/09/2008
Chimney must be isolated well to increase the
combustion quality. You may use maximum two elbows
between chimney and flue gas box.
You must take measures against rain or water
consisted as a result of condesnsing waste gases.
The chimneys have to be comlied with national
and European Standards.
Caution! Mount an air relief device onto outlet
pipe of boiler hot water. Air relief device must be
installed by installator company
installation to the points where air may be exist on
installation except boiler.
Carrying and transportation must be done
together with original packaging material of device
considering the marking on the boiler. Please protect the
boiler against factors that can damage to packaging
material and device.
Caution! Check the slants of boiler installation
connetions with a water gauge. After slants have been
done, there must not been any air in the system.
Caution! As the boiler works or in case of
operation of the boiler without water, water must not be
pumped to the boiler directly. The boiler water must be
gave at low temperature when the boiler does not
operate. Otherwise system may come to harm. Cold
water must not be pumped into hot boiler. Otherwise
the boiler will be out of warranty and manufacturer
company is not responsible for physical and
sipiritual damages.
12
LP 20
LP 40
Ø130
Ø150
in accordance with
LP 60
LP 80
Ø180
Ø200

Advertisement

Table of Contents
loading

Table of Contents