Swashplate/Washout Installation - JR Vibe 90SG Assembly Instructions Manual

Table of Contents

Advertisement

4 1
SWA SH P L A TE/W A SHOUT INST A LL A T I ON
Setscrew, 3 x 3mm (3pcs)
Socket Head Bolt, 3 x 14mm (2pcs)
Flat Head Screw, 2 x 10mm (6pcs)
Steel Joint Ball (6pcs)
If there is play between the upper and lower Swashplate, tighten
Setscrew 3 x 3mm to lower the swashplate little by little. Do not
overtighten as binding and damage to the bearing will occur.
Hold Upper Plate
and check play.
120/140 Swashplate Assembly
Long Control Ball,
28.25mm (2pcs)
Control Ball, 9mm (2pcs)
140 CCPM
It is a good idea to size the
ball links with the JR Ball
Link Sizing tool prior to
attachment.
Joint Ball Spacer, 2.75mm (4pcs)
Washer, 3 x 4.5 x 1mm (2pcs)
Control Ball, 9mm (3pcs)
Long Control Ball, 28.25mm (2pcs)
Washout Base
120 CCPM
Swashplate Limiter
Install the long control balls for
140 CCPM or the short control
balls for 120 CCPM depending
Note the proper direction
As shown in the gure below,
the JR PROPO logo on the washout
arm should be upside down.
Washer, 3x4.5x1mm (2pcs)
This Position
Setscrew,
3x3mm (3pcs)
29
on the type you will use.
of the washout base.
Washout Arm
Assembly (2pcs)
Socket Head Bolt,
3x14mm (2pcs)
Control Ball, 9mm
Flat Head Screw,
2x10mm (6pcs)
Steel Joint Ball (6pcs)
Joint Ball Spacer,
2.75mm (4pcs)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents