Yunca Gas LEEDZ Operations, Maintenance & Warranty Information

Hide thumbs Also See for LEEDZ:

Advertisement

GAS HEATER
July 2001
OPERATIONS, MAINTENANCE
&

WARRANTY INFORMATION

25-07-01
Page 1 of 22
Operation Instructions for Leedz Free Standing July 2001.doc

Advertisement

Table of Contents
loading

Summary of Contents for Yunca Gas LEEDZ

  • Page 1: Warranty Information

    GAS HEATER July 2001 OPERATIONS, MAINTENANCE & WARRANTY INFORMATION 25-07-01 Page 1 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 2: Table Of Contents

    OPERATION MAINTENANCE FAULT FINDING GUIDE Appendix A GAS TYPE CONVERSION Appendix B PARTS LIST Appendix C INJECTOR SIZES Appendix D WARRANTY, WIRING DIAGRAM Appendix E WARRANTY REGISTRATION 25-07-01 Page 2 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 3: Introduction

    Australian and New Zealand standards. The installation of the YUNCA LEEDZ FLUED GAS HEATER must be carried out by a suitably qualified person and comply with the current New Zealand or Australian installation code, NZS 5261:1996/ AG 601:1998 CAUTION : This appliance must be flued to atmosphere.
  • Page 4: Installation

    INSTALLATION Considerations The most desirable and beneficial location for a YUNCA LEEDZ HEATER is in the centre of a building, thereby allowing the most efficient use of the heat created. The location of windows, doors and the traffic flow in the room where the heater is to be located, should all be considered.
  • Page 5: Flue Installation

    Typical Flue Installation 25-07-01 Page 5 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 6: Clearances

    CLEARANCES The YUNCA LEEDZ FLUED GAS HEATER should be installed with clearances equal to or greater than those recommended below and comply with NZS 5261/ AG601. This is to ensure adequate air circulation around the heater and avoid heat damage to wall coverings.
  • Page 7: Connection To Gas Supply

    Burn only the fuel for which the heater is equipped. The YUNCA LEEDZ may be shipped from the factory equipped to burn Natural Gas, Propane or L.P.G. The data plate affixed to the back of the heater specifies the gas type which the heater is factory equipped for.
  • Page 8: Testing Pressures

    Refer to fig. 4 below CONNECTING THE FAN The fan should be connected to the mains supply (240V 50Hz) via the 3m flex and 3pin plug provided. 25-07-01 Page 8 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 9: Operation

    8. After the front burner has been on for at about 3 minutes. Turn the back burner on, by pushing in knob “C” and turning Anti-Clockwise to maximum position. 25-07-01 Page 9 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 10 4. Push in the pilot control knob “A” and turn it clockwise to off. Note: the knob cannot be turned from “pilot” to “off” unless it is pushed in slightly. Do not force it. 25-07-01 Page 10 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 11: Maintenance

    5. Remove the side glasses 6. New glass with gasket attached can be ordered through your YUNCA LEEDZ agent. Note: Only recommended heat resistant glass may be fitted. 7. Place replacement glass in position in the reverse order of removal, i.e. Side glass should be placed in position before front glass.
  • Page 12 REPLACING THE GASKET. The YUNCA LEEDZ has a 10mm fibreglass gasket surrounding the front door. Should it ever need replacement, use only the replacement gasket that is available from your YUNCA dealer. The reference number for this is listed in the parts list.
  • Page 13 CLEANING THE FAN FILTER This is the one maintenance procedure designed to be carried out by the householder. It can be cleaned with a brush or vacuum cleaner, and replaced. 25-07-01 Page 13 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 14 5. The fan unit will now slide out of the back of the heater. 6. When the fan has been removed it can be disassembled as shown below if needed. 25-07-01 Page 14 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 15: Fault Finding Guide

    Check for any obstructions in the gas line that may cause low pressure or restrict flow. Purge gas lines. No Supply Gas. L.P.G. -- Refill tank Natural -- Check with gas supplier. 25-07-01 Page 15 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 16 Severe down draught. If the flame pattern is disturbed during extreme winds then ensure a recommended flue cowl has been fitted and is still in place. 25-07-01 Page 16 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 17 Extract the control valve, note position. the position. Clean the control valve clean and re-assemble. Test operation. 25-07-01 Page 17 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 18: Appendix Agas Type Conversion

    9. It is now possible to remove the entire main burner module. 10. This will expose the pilot assembly and make it possible to disconnect the gas 25-07-01 Page 18 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 19 Test all connections for gas tightness and replace logs and door. 16. Update or replace appliance data plate for new specifications and gas type. 25-07-01 Page 19 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 20: Parts List

    GAS TYPE FRONT BURNER BACK BURNER NATURAL 2.3mm diameter 2.8mm diameter L.P.G. (NZ only) 1.15mm diameter 1.15mm diameter PROPANE 1.20mm diameter 1.20mm diameter Australia 1.1mm diameter 1.1mm diameter 25-07-01 Page 20 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...
  • Page 21: Warranty, Wiring Diagram

    APPENDIX D: Warranty: The Yunca Leedz Inbuilt Gas Heater is covered by a limited Five-Year Warranty against defects in materials and workmanship. All gas and electrical components including control, burners, pilot assembly, tubing, fan and switchers are warranted for a period of one year from date of purchase.
  • Page 22: Warranty Registration

    Purchasers' Name. ___________________________________________________________ Purchasers’ Address. _________________________________________________________ City. _____________________________ PostCode. ____________ Telephone __________ Where Purchased. ____________________________________________________________ Installed By. ________________________________________________ Date. _____________ Return to: Yunca Heating PO Box 932 INVERCARGILL 25-07-01 Page 22 of 22 Operation Instructions for Leedz Free Standing July 2001.doc...

Table of Contents