CLEARANCES CONNECTING THE FAN CONNECTION TO GAS SUPPLY TESTING PRESSURES OPERATION MAINTENANCE/CLEANING FAULT FINDING GUIDE Appendix A PARTS LIST Appendix B INJECTOR SIZES Appendix C WARRANTY WARRANTY REGISTRATION 16-02-05 Page 2 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE. DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE. DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL. 16-02-05 Page 3 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
The earthquake brackets are located at the front corners of the heater and are exposed by removing the hearth. 16-02-05 Page 4 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 5
16-02-05 Page 5 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 6
16-02-05 Page 6 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
RH panel to protect the power cord from damage. Note: Do not position the Power lead on top of the fan. 16-02-05 Page 7 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 8
CAUTION: Do not use this heater if any part has been under water or exposed to moisture causing corrosion. A Qualified service technician should inspect the heater and replace any part of the gas system that has been under water. 16-02-05 Page 8 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
MIMIMUM PRESSURE: Turn off the power supply and, keeping nut C stationary, screw in Screw D to increase the pressure and screw it out to decrease the pressure. Carefully put back the modulator plastic cap. 16-02-05 Page 9 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Thermostat control is at the front of the hearth The thermostat must be adjusted to a temperature above the room temperature or the thermostat will not allow the burners to light. 16-02-05 Page 10 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 11
4. When the 30 minutes is up the fire will shut down. 5. The restart, follow the to start procedure. The time delay can be over ridden by following the Turning off no time delay. 16-02-05 Page 11 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 12
5. The bark consists of a mixture of vermiculite and composite chips and it can be dusted by sieving. If needed a replacement bag can be ordered through your YUNCA dealer. (See parts list for reference number) 16-02-05 Page 12 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 13
NOTE: The fan assembly should only be disassembled by an electrician or trained Yunca Technician. 9. The process is reversed for installation and the fans operation is tested. 16-02-05 Page 13 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 14
8. A new Electronic Flame Controller Assembly is replaced in the reverse order. NOTE: The wires retained by ties must be securely positioned to ensure that insulation is not damaged causing a short circuit due to excessive heat. 16-02-05 Page 14 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Spark gap should be 3-4mm between the incorrect. electrode and the pilot flame hood outlet. No Supply Gas. L.P.G. -- Refill tank Natural -- Check with gas supplier 16-02-05 Page 15 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
Page 16
Burner injectors may be Clean out injector orifice. Pilot burning, no gas blocked. to burners Faulty control Electronic Control Valve or Controller requires replacement. 16-02-05 Page 16 of 19 Operation Instructions for Electronic InBuilt EIB 2002...
EROS05 Log Set APPENDIX B INJECTOR SIZE: GAS TYPE FRONT BURNER BACK BURNER NATURAL 2.3mm diameter 2.8mm diameter L.P.G. 1.15mm diameter 1.15mm diameter PROPANE 1.25mm diameter 1.25mm diameter 16-02-05 Page 17 of 19 Operation Instructions for Electronic InBuilt EIB 2002...