The rails and necessary hardware are supplied by IBM (optional).
Tower installation
About this task
To install the unit in a tower configuration:
Procedure
1. Place the UPS on a flat, stable surface in its final location.
2. Always keep 150 mm of free space behind the UPS rear panel.
3. If installing additional units, place them next to the UPS in their final location.
23
Chapter 3. Installation