Tower Installation; Installing The Communication Card - Lenovo RT1.5kVA Installation And User Manual

2u rack or tower ups
Hide thumbs Also See for RT1.5kVA:
Table of Contents

Advertisement

Tower installation

Procedure
1. Attach tower supports as shown.
2. Adjust the orientation of the LCD panel and the logo, as shown.

Installing the communication card

About this task
Note: It is not necessary to shut down the UPS before installing the UPS Network
Management Card.
22
Installation and User's Guide
1. Remove the connector panel blank (
which is secured by two screws.
2. Insert the UPS Network Management
Card into the slot.
3. Secure the panel by tightening the two
screws.
),

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt3.0kvaRt2.2kva

Table of Contents