Tower installation
Procedure
1. Attach tower supports as shown.
2. Adjust the orientation of the LCD panel and the logo, as shown.
Installing the communication card
About this task
Note: It is not necessary to shut down the UPS before installing the UPS Network
Management Card.
22
Installation and User's Guide
1. Remove the connector panel blank (
which is secured by two screws.
2. Insert the UPS Network Management
Card into the slot.
3. Secure the panel by tightening the two
screws.
),