Check Before Initial Start-Up; Filling The Reserve Supply Container; Firewin Klassik - Manual Filling; Firewin Premium And Exklusiv - Fully Automatic Filling - Baxi Bioflo 12 kW Granite User Operating Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

Operation
2.2

Check before initial start-up

a) System pressure (heating water pressure):
The system must be filled and vented. With the system cold, pressure should be at least 1.0 bar (maximum
1.8 bar) – Fig. 8 If you have any questions, your installer will gladly answer them.
Fig. 8
b) Ventilation:
If you are operating the device with room air, please make sure the room where it is installed is well venti-
lated. The air supply must be as free of dust as possible.
c) Flue:
Please have the chimney sweep check the flue, and, if necessary, clean it.
2.3

Filling the reserve supply container

2.3.1 FireWIN Klassik – Manual filling
Note: Do not open the reserve supply container cover unless the glass cover is closed, in order to avoid dama-
ging the glass cover.
Fold open the cover of the reserve supply container (Fig. 9) and fill the reserve supply container up to max. 1
cm below the edge. Close the cover.
Tip:The reserve supply container should always be completely filled with pellets. This allows the incoming pel-
lets to drop into the container better, reduces the size of the conical part of the pile and means that the contai-
ner empties better.
When filling, make sure no extraneous materials (e.g. shreds of the pellet bags resulting from cutting
open the bags) enter the reserve supply container – they could block the rotary feeder!
Fig. 9
2.3.2 FireWIN Premium and Exklusiv – fully automatic filling
The reserve supply container is filled by the fully automatic pellet feed. WINDHAGER Customer Service or the custo-
mer service PARTNER will perform the first fill (start-up), take the boiler and its pellet supply into service and fami-
liarise the customer with the operation and cleaning of the boiler, with reference to the Operating Manual.
Filling the system
Folding open the cover
Pressure gauge (system pressure)
Filling and evacuation cock
11

Advertisement

Table of Contents
loading

Table of Contents