2.2

Check before initial start-up

a) System pressure (heating water pressure):
The system must be filled and vented. With the system cold, pressure should be at least 1.0 bar (maximum
1.8 bar) – Fig. 6 If you have any questions, your installer will gladly answer them.
Fig. 6
b) Ventilation:
If you are operating the device with room air, please make sure the room where it is installed is well venti-
lated. The air supply must be as free of dust as possible.
c) Flue:
Please have the chimney sweep check the flue, and, if necessary, clean it.
2.3

Filling the reserve supply container

2.3.1 BAXI Bioflo – Manual filling
Note: Do not open the reserve supply container cover unless the glass cover is closed, in order to avoid dama-
ging the glass cover.
Fold open the cover of the reserve supply container (Fig. 7) and fill the reserve supply container up to max. 1
cm below the edge. Close the cover.
Tip:The reserve supply container should always be completely filled with pellets. This allows the incoming pel-
lets to drop into the container better, reduces the size of the conical part of the pile and means that the contai-
ner empties better.
When filling, make sure no extraneous materials (e.g. shreds of the pellet bags resulting from cutting
open the bags) enter the reserve supply container – they could block the rotary feeder!
Fig. 7
Filling the system
Folding open the cover
Pressure gauge (system pressure)
Filling and evacuation cock