Baxi Bioflo 12 kW Granite User Operating Instructions Manual page 36

Pellet central heating system boiler
Table of Contents

Advertisement

Operation
2.8.1.6
Ash compression time profile
The ash in the ash pan is only compressed at the 2 set start times
and when approx. 15 kg of fuel has been consumed. The start times
can be set in steps of 15 minutes (start time 1 and start time 2).
Factory setting:
Start time 1:
Start time 2:
Pressing one of the six buttons switches the lighting and display
on – Fig. 107.
Press the Menu button – Fig. 108.
Confirm the selected menu item „Operator level" by pressing the
Choose button – Fig. 109.
Use the arrow buttons to select the sub-menu item „ Time profile
ash comp. " – Fig. 110.
Confirm the selected sub-menu item „ Time profile ash comp. " by
pressing the Choose button – Fig. 111.
08:00
22:00
35
Boiler temperature
42
(Operating phases)
Lighting ON
RESET
Fig. 107
Boiler temperature
42
(Operating phases)
Info
RESET
Fig. 108
Operator level
Service level
Choose
Back
RESET
Fig. 109
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Boiler cleaning
Choose
Back
RESET
Fig. 110
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Boiler cleaning
Choose
Back
RESET
Fig. 111
°C
5s
°C
5s
Menu
5s
5s
5s

Advertisement

Table of Contents
loading

Table of Contents