Installation - Toro Workman 1100 Service Manual

Hide thumbs Also See for Workman 1100:
Table of Contents

Advertisement

Installation

1. Install pulley to the starter/generator shaft (Fig. 21).
A. Position spacer and woodruff key onto the shaft.
Place pulley onto the shaft.
B. Secure pulley to the shaft with spring washer and
nut. Torque nut from 15 to 25 ft–lb (20 to 34 N–m).
2. Position starter/generator to the engine mount.
A. Insert pivot bolt through the engine mount, start-
er/generator front bracket, pivot, and starter/genera-
tor rear bracket.
B. Install flanged lock nut onto the pivot bolt.
C. Tighten lock nut enough so starter/generator piv-
ots with slight resistance.
3. On the Workman 2100 and 2110 (Fig. 19):
A. Insert end of starter rod with jam nuts through the
torque arm.
B. Secure starter rod to the starter/generator with
the cotter pin.
4. On the Workman 1100 and 1110 (Fig. 20):
A. Install carriage bolt through starter flange and
starter bracket.
B. Thread flange nut onto carriage bolt.
5. Correctly connect all wires to the starter/generator.
6. Install V–belt to the pulley. Adjust V–belt (see Adjust
Starter/Generator Belt in Engine Chapter).
Workman 1100/1110/2100/2110
2
4
5
1. Starter/generator
2. Flanged lock nut
3. Pivot bolt
4. Pivot
5. Engine mount
Page 6 – 17
Rev. B
1
9
10
8
15 to 25 ft lbs
(20 to 34 N–m)
3
Figure 21
6. Nut
7. Lock washer
8. Pulley
9. Woodruff key
10. Spacer
Electrical System
7
6

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Workman 1110Workman 2100Workman 2110

Table of Contents