Commissioning - E.C.A. Confeo Premix CP 24 HST Installation And User's Operating Instructions

High-efficiency condensing boilers (compatible with externa ldhw tank)
Table of Contents

Advertisement

COMMISSIONING

Final Checks And Operations
Filling the boiler and central heating circuit with water.
1
- Firstly, turn on all the radiator valves.
- Check inlet and outlet CH valves. The valves must be open.
- Open the manual air vent on the top of the boiler (fig. 23).
1)
- Open filling tap
slowly to fill the system.
- Turn off the manual air vent when water starts to squirt.
- Keep up filling until 1,5 – 2 bar water pressure.
- Turn off the filling tap.
CAUTION: Do not forget to turn off the filling tap, water can leak and
- Turn on the air vents on the radiators to set air free until water squirts. Repeat this process for all
the radiators.
- Check the CH water pressure again, and turn on the filling tap to increase water pressure to
1,5 – 2 bar level.
- Check radiator vents whether any air in the water pipes or not. Air must be purged out entirely for
efficient heating.
- Check any leakage in the radiator and the water pipes finally.
1)
The filling tap is not available in some models based on national and local regulations.
: Having completed the installation and connections (condensate, flue,
electricity, supply, gas supply and water circuits) of the boiler
according to the authorized gas company regulations and relevant
standards, the final checks and operations must be carried out by
qualified person.
cause damage.
fig. 23
31

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Confeo Premix CP 24 HST and is the answer not in the manual?

This manual is also suitable for:

Confeo premix cp 30 hst

Table of Contents