CONNECTIONS
Condensate Connection
- A plastic pipe should be fixed to the outlet pipe of the siphon and the pipe should be connected to
1)
the drain line.
If National and local requirements do not allow this such a connection, the
outlet pipe of the siphon should be open connection and should not be closed/blocked.
- If the pipe work is not terminated within the building, the pipe must be insulated against freezing.
- The connecting pipes and the fittings must be made of plastic material only.
- All horizontal pipes must be connected at a slight 2
flow.
Before connecting the flue, pour approximately 1 liter of water into the flue gas outlet to fill the
siphon (fig. 7). This prevents the risk of flue gases escaping into the insallation room.
WARNING: Before connecting the flue, siphon must be filled with water to prevent
National and local requirements should be take into consideration.
1)
:All condensing boilers generate condensate discharge. The amount of
condensate water depends on the working conditions of your appliance.
This can be up to 1,7 litres of condensate water an hour.
the risk of flue gases escaping into the installation room.
0
0
or 3
downwards incline to ensure a good
fig. 7
16