Panasonic CS-G93KE Service Manual page 44

Table of Contents

Advertisement

CS-G93KE
Installation Information
Indoor / Outdoor unit installation diagram
Length of power supply cord
about 1.1 m
< <
• This illustration is for explanation purposes only.
The indoor unit will actually face a different way.
Piping direction
about 1.8 m
Right
Right
rear
<
<
Right bottom
5 cm
or more
Air purifying filter 5
(Left and right are identical)
Insulation of piping connections
Carry out installation
after checking for gas
leaks.
After securing with
three of the vinyl
tape 8, wrap with
vinyl tape 9.
(Front side)
Left
Left
rear
Left bottom
Installation plate 1
Sleeve (*)
Bushing-Sleeve (*)
Putty, (Gum Type Sealer) (*)
Bend the pipe as closely on the
wall as possible, but be careful
that it doesn't break.
Vinyl tape (Wide) (*)
• Apply after carrying out a
drainage test.
• To carry out the drainage
Vinyl tape
test, remove into the heat
9
exchanger. To carry out the
Vinyl tape 8
drainage test, remove into
the heat exchanger.
Saddle (*)
Connecting cable
(4-CORE WIRE/1.5 mm
Locally approved cable.
Additional drain hose (*)
1/4" Liquid side piping (*)
Gas side piping (*)
3/8" (G93KE)
1/2" (G123KE)
– 49 –
Attention not to bend up drain hose
Installation parts you must
purchase (*)
2
)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-g93keCs-g123keCu-g123ke

Table of Contents