CS-G93KE
Installation Information
Indoor / Outdoor unit installation diagram
Length of power supply cord
about 1.1 m
< <
• This illustration is for explanation purposes only.
The indoor unit will actually face a different way.
Piping direction
about 1.8 m
Right
Right
rear
<
<
Right bottom
5 cm
or more
Air purifying filter 5
(Left and right are identical)
Insulation of piping connections
•
Carry out installation
after checking for gas
leaks.
•
After securing with
three of the vinyl
tape 8, wrap with
vinyl tape 9.
(Front side)
Left
Left
rear
Left bottom
Installation plate 1
Sleeve (*)
Bushing-Sleeve (*)
Putty, (Gum Type Sealer) (*)
Bend the pipe as closely on the
wall as possible, but be careful
that it doesn't break.
Vinyl tape (Wide) (*)
• Apply after carrying out a
drainage test.
• To carry out the drainage
Vinyl tape
test, remove into the heat
9
exchanger. To carry out the
Vinyl tape 8
drainage test, remove into
the heat exchanger.
Saddle (*)
Connecting cable
(4-CORE WIRE/1.5 mm
Locally approved cable.
Additional drain hose (*)
1/4" Liquid side piping (*)
Gas side piping (*)
3/8" (G93KE)
1/2" (G123KE)
– 49 –
Attention not to bend up drain hose
Installation parts you must
purchase (*)
2
)