2
Installation
▶ Installation of the machine should be performed by a trained engineer.
▶ Any electrical wiring must be performed by a qualified technician or agent.
▶ The machine weighs over 43kg. At least 2 persons should carry out the installing work.
▶ Plug in after the installation is complete.
▶
▶ Connect the ground (earth) wire.
▶
▶ Place the belt cover on top of the machine.
▶ Use both hands when bending the machine backwards or returning it to the normal position.
1) Installation of machine head
Insert the hinge rubber① into the table. After inserting the oil tray in the middle of head supporting rubber B② as shown in
the figure 1, install it into the table. Insert the machine head hinge③ into the bed holes. By inserting it into the hinge rubber
①, stand the machine on the head support rubber A④ and the head support rubber B②.
2) Installation of power switch box
When attaching the power switch box ①, refer to Figure 2 to
make sure that it is placed at the lower right of the table.
10
If the operator mistakenly steps down on the pedal with the pug in, the machine will start
automatically and can cause physical injuries.
An unstable connection may result in an electric shock or a malfunction.
Using only one hand can lead to severe hand injuries due to the weight of the machine.
oil tray (oil fan)
Warning
[Figure 1]
[Figure 2]